4.2.4. Sequence
An ordered set of durations with specified offsets without a definite start time. Example: Profile of power usage in 30 minute intervals.
Proposed: Use of a set of related VTODOs to specify a sequence of durations. Introduce a new reltype param to indicate the relation of the VTODOs to each other.